DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.411 Ground clearance: tail rotor guard.

14 CFR 29 · Strength Requirements · Control Surface and System Loads · at 29-59 (current)

Text in force at 29-59: from 29-0, effective 1 Feb 1965.

(a) It must be impossible for the tail rotor to contact the landing surface during a normal landing. (b) If a tail rotor guard is required to show compliance with paragraph (a) of this section-- (1) Suitable design loads must be established for the guard; and (2) The guard and its supporting structure must be designed to withstand those loads.

29 FR 16150 · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.