DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.661 Rotor blade clearance

CS-29 · Subpart D — Design And Construction · at CS29-12 (current)

Text in force at CS29-12: from CS29-0, effective 14 Nov 2003.

There must be enough clearance between the rotor blades and other parts of the structure to prevent the blades from striking any part of the structure during any operating condition.

ED Decision 2003/016/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.