DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.411 Ground clearance: tail rotor guard

CS-29 · Subpart C — Strength Requirements · at CS29-12 (current)

Text in force at CS29-12: from CS29-0, effective 14 Nov 2003.

(a) It must be impossible for the tail rotor to contact the landing surface during a norm al landing. (b) If a tail rotor guard is required to show compliance with sub-paragraph (a): (1) Suitable desi gn l oads m ust be established for the guard; and (2) The guard and its supporting structure m ust be desi gned t o wi thstand those loads.

ED Decision 2003/016/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.