DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.1049 Hovering cooling test procedures.

14 CFR 29 · Powerplant · Cooling · at 29-59 (current)

Text in force at 29-59: from 29-0, effective 1 Feb 1965.

The hovering cooling provisions must be shown-- (a) At maximum weight or at the greatest weight at which the rotorcraft can hover (if less), at sea level, with the power required to hover but not more than maximum continuous power, in the ground effect in still air, until at least five minutes after the occurrence of the highest temperature recorded; and (b) With maximum continuous power, maximum weight, and at the altitude resulting in zero rate of climb for this configuration, until at least five minutes after the occurrence of the highest temperature recorded.

29 FR 16150 · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.