Text in force at 25-153: from 25-41, effective 1 Sep 1977.
[(a) Pressurization system elements must be burst pressure tested to 2.0 times, and proof pressure tested to 1.5 times, the maximum normal operating pressure.
(b) Pneumatic system elements must be burst pressure tested to 3.0 times, and proof pressure tested to 1.5 times the maximum normal operating pressure.
(c) An analysis, or a combination of analysis and tests, may be substituted for any test required by paragraph (a) or (b) of this section if the Administrator finds it equivalent to the required test.]
42 FR 36971 · Source