DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.63 Takeoff: Category B.

14 CFR 29 · Flight · Performance · at 29-59 (current)

Text in force at 29-59: from 29-12, effective 1 Feb 1977.

[The horizontal distance required to take off and climb over a 50-foot obstacle must be established with the most unfavorable center of gravity. The takeoff may be begun in any manner if--] (a) The takeoff surface is defined; (b) Adequate safeguards are maintained to ensure proper center of gravity and control positions; and (c) A landing can be made safely at any point along the flight path if an engine fails.

41 FR 55471 · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.