DRS

Dek Regulatory System

Welcome to the World of Certification!

§25.737 Skis.

14 CFR 25 · Design and Construction · Landing Gear · at 25-153 (current)

Text in force at 25-153: from 25-0, effective 1 Feb 1965.

Each ski must be approved. The maximum limit load rating of each ski must equal or exceed the maximum limit load determined under the applicable ground load requirements of this Part.

29 FR 18291 · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.