DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.55 Take-off Decision Point:

CS-29 · Subpart B — Flight · at CS29-12 (current)

Text in force at CS29-12: from CS29-0, effective 14 Nov 2003.

Category A (a) The take-off decision point (TDP) is the first poi nt from whi ch a cont inued take-off capability is assured under CS 29.59 and is the last point in the take-off path from which a rejected take-off is assu red with in the distance determined under CS 29.62. (b) The TDP must b e estab lished in relatio n to the take-off path usi ng no m ore t han t wo parameters, such as ai rspeed and hei ght, t o designate the TDP. (c) Determination of th e TDP m ust in clude the p ilot reco gnition tim e interval following failure of the critical engine.

ED Decision 2003/016/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.