DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.53 Take-off: Category A

CS-29 · Subpart B — Flight · at CS29-12 (current)

Text in force at CS29-12: from CS29-0, effective 14 Nov 2003.

The take-off perform ance m ust be determ ined and scheduled so t hat, i f one engi ne fai ls at any time after the start of take-off, the rotorcraft can: (a) Return to and stop safely on, the take-off area; or (b) Continue t he t ake-off and cl imb-out, and attain a confi guration and airspeed allowing compliance with CS 29.67(a)(2).

ED Decision 2003/016/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.