DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.471 General

CS-29 · Subpart C — Strength Requirements · at CS29-12 (current)

Text in force at CS29-12: from CS29-0, effective 14 Nov 2003.

(a) Loads and equilibrium. For l imit ground loads: (1) The limit ground l oads obt ained i n the l anding condi tions i n t his C S-29 m ust be considered to be exte rnal loads that would occur in the rotorcraft structure if it were acting as a rigid body; and (2) In each specified landing condition, the external loads must be placed in equilibrium with l inear and angul ar i nertia loads in a rational or conservative manner. (b) Critical centres of gravity. The critical centres of gravity within th e ran ge fo r wh ich certification is requested m ust be selected so that the m aximum design loads are obtained in each landing gear element.

ED Decision 2003/016/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.