DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.1310 Power source capacity and distribution

CS-29 · Subpart F — Equipment · at CS29-12 (current)

Text in force at CS29-12: from CS29-11, effective 8 Feb 2023.

For Category A rotorcraft, each installation whose functioning is required to comply with type-certification requirements, airspace requirements or operating rules, and which requires a power supply, is an ‘essential load’ on the power supply. The power sources and the system must be able to supply the following power loads in probable operating combinations and for probable durations: (a) Loads connected to the system with the system functioning normally. (b) Essential loads, after failure of any one prime mover, or one power source. (c) Essential loads, after failure of: (1) any one engine, on rotorcraft with two engines; and (2) any two engines, on rotorcraft with three or more engines.

ED Decision 2023/001/R · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.