DRS

Dek Regulatory System

Welcome to the World of Certification!

§29.1143 Engine controls

CS-29 · Subpart E — Powerplant · at CS29-12 (current)

Text in force at CS29-12: from CS29-0, effective 14 Nov 2003.

(a) There m ust be a separat e power control for each engine. (b) Power controls m ust be arranged t o allow ready synchronisation of all engines by: (1) Separate control of each engine; and (2) Simultaneous control of all engines. (c) Each power cont rol m ust provi de a positive and immediately responsive m eans of controlling its engine. (d) Each fluid injection cont rol ot her t han fuel sy stem cont rol m ust be i n t he corresponding power control. However, t he i njection sy stem pump may have a separate control. (e) If a power control incorporates a fuel shutoff feat ure, t he cont rol m ust have a means to prevent t he i nadvertent m ovement of the control into the shutoff position. The means must – (1) Have a p ositive lo ck o r sto p at the idle position; and (2) Require a separat e and di stinct operation to place the control in the shutoff position. (f) For rotorcraft to be certificated for a 30- second OEI power rat ing, a means must be provided to au tomatically activ ate an d co ntrol the 30-second OEI power and prevent any engine from exceeding the installed engine lim its associated with the 30-second OEI power rat ing approved for the rotorcraft.

ED Decision 2003/016/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.