DRS

Dek Regulatory System

Welcome to the World of Certification!

§27.683 Operation tests

CS-27 · Subpart D — Design And Construction · at CS27-10 (current)

Text in force at CS27-10: from CS27-0, effective 14 Nov 2003.

It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from: (a) Jamming; (b) Excessive friction; and (c) Excessive deflection.

ED Decision 2003/015/RM · Source

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.