DRS

Dek Regulatory System

Welcome to the World of Certification!

§3.16 Flight tests.

CAR 3 (Reissue) · Certification · General · at CAR3R-8 (current)

Text in force at CAR3R-8: from CAR3R-0, effective 15 May 1956. OCR text

After proof of compliance with the structural requirements contained in this part, anc upon completion of all necessary inspections and testing on the ground, and proof of the conformity of the airplane:with the type design, and upon receipt from the applicant of a report of flight tests performed by him, the following shall be conducted: ; (a) Such official flight tests as the Administrator finds necessary to determine compliance with the requirements of this part. (b) After the conclusion of flight tests specified in paragraph (a) of this section, such additional flight tests, on airplanes having a maximum certificated take-off weight of more than-6,000 pounds, as the Administrator finds necessary to ascertain whether there is reasonable assurance that the airplane, its components, and equipmrent are reliable and function properly. The extent of such additional flight tests shall depend upon the complexity of the airplane, the number and nature of new design features, and the record of previous “ests and experience for the particular airplane type, its components, and equipment. If practicable, these flight tests shall be conducted on the same airplane used in the flight tests specified in paragraph (a) of this section.

Report an issue

Report an issue

Is something wrong with what you are looking at? Tell the maintainer; the report is filed against this page.

What kind of issue is it? (required)

Reports are posted publicly on GitHub with the address of this page. Please don't include personal information.